Preliminary & Detailed design of Raw water for green spaces in Damghan City
Studies of the first and second phase of Raw water for green spaces in Damghan City
100%
- 90
- The total length of piping
- polyethylene
- Pipes Material
- 63 to 500
- Used diameters
- 4000 cubic meters
- The total volume of concrete reservoir
- 14 pumping stations with a total power of 780 kW
- Pumping station specifications